Components of the Community Access Road

Major components of the new community access road will include:

  • All Season Road: New all season two-lane road cleared to a width of 60 metres. Principle
    building material will be blasted rock-fill.
  • Borrow Pits: Rock quarries and borrow areas will be developed beside the proposed community
    access road to provide crushed rock and granular materials for construction.
  • Bridges: Required over waterways; bridge sizes will range from single- to multi-span bridges.
  • Temporary Access Roads and Work Camps: May be required during construction.